Metrak
Guides

Construction Cost & Estimating Guides

Practical, no-fluff guides on the numbers every contractor needs to get right: profit, markup, project cost, and BOQs.

How to Calculate Construction Profit
The formula for construction profit, a worked example, and common mistakes that quietly erase margin.
Construction Markup vs. Profit Margin: What Is the Difference?
Markup and margin use the same numbers but answer different questions. Confusing them is one of the most common pricing mistakes contractors make.
How to Calculate Construction Project Cost
A breakdown of every cost category in a construction project and how to roll them up into an accurate total.
What Is a BOQ (Bill of Quantities)?
A plain-language definition of a Bill of Quantities, what it contains, and why contractors rely on it for pricing.
How Contractors Track Project Costs (Without Losing Their Minds)
From spreadsheets to dedicated software — practical methods contractors use to keep actual cost aligned with budget.
How to Prepare a Construction Quotation
What a solid construction quotation includes, step by step, from scope to pricing to terms.