Metrak
Projects & planning

Drawings workspace

Your drawings become a live map of the site - pins, measurements, even 3D.

Web: Project → Drawings Phone: Project → Drawings Drawings add-on - free on every plan.

What it is

Open any PDF, image or DWG/DXF drawing full screen. Set the scale once, then measure lengths, areas and perimeters (tap a room). Mark it up with pens, arrows, shapes and text. Drop a pin to create a real record right there: site issue, task, RFI, NCR, safety incident, photo, work item (BOQ) or cost (change order). Check where two sets of layers clash (for example plumbing against walls), and turn a CAD plan into a 3D model of the building.

Why you'll love it

  • Issues have an exact location - no more “the crack near the stairs somewhere”.
  • Each pin shows the live status of its record.
  • Revisions, PDF export with or without your markup.
  • Measure a room by tapping inside it - area and perimeter in one click.
▶ Watch it
Pin issues on drawings
metrak.ai
Today
Projects
Dashboard
Tasks
Operations
Procurement
Finance
Documents
Reports
AI & Tools
Settings
Ground floor plan · Rev B
MeasureAreaMarkupAdd pin3D
Task ✓

Open a drawing from the project's Drawings tab. PDF, image, DWG or DXF.

Step 1 of 5

How to do it

Tick each step as you try it in Metrak.

How it connects

Records you create here flow into - or come from - these features.

More in Projects & planning

Projects
BOQ & budget
Schedule: milestones & tasks
3D building view
✨
Change orders & retention
Client progress link
✨
PreviousSchedule: milestones & tasksNext3D building view

Ready to run your projects on Metrak?

Start free - no credit card. Your whole team can be on it today.