Metrak
Documents & reports

Documents

Every file in one searchable library - with AI summaries.

Web: Documents & Reporting → Documents · Project → Documents Phone: More → Documents Every plan

What it is

Upload contracts, specs, permits, photos, videos and drawings, by category and project. Photos and videos preview in place. Ask AI to summarise an image or PDF, or analyse a drawing (“Summary & improvements” or “Inspection report”). Files uploaded with the Drawing category go straight into the project's drawing register.

Why you'll love it

  • Find the right revision in seconds, from any device.
  • Identical files are stored once - uploads stay fast.
  • Star the documents you open every day.

How to do it

Tick each step as you try it in Metrak.

How it connects

Records you create here flow into - or come from - these features.

More in Documents & reports

Reports & analysis
Printouts, signatures & QR
PreviousProposalsNextReports & analysis

Ready to run your projects on Metrak?

Start free - no credit card. Your whole team can be on it today.